Activity GEARBOX OVERHAUL Blackleast check after overhaulCondition box after vertical carrier dismantleBevel Gear Seat on Vertical Lower bearing GENERATOR OVERHAUL GT1B Compressor RemovalAttach the hook for lifting rotorLifting Rotor from Platform Generator ExciterGenerator Exciter TURBINE MAJOR OVERHAUL Checking RotorLifting Turbine CompressorCasing Turbine Compressor Condition GT1BLifting Turbine Compressor COMBUSTION INSPECTION Inspect & marking seal plate before dismantleUse crane to lift up the air ductDismantle & Remove Air Duct Compartment Hydro Test to check pipe leakCombustion cane completely dismantle FIRE FIGHTING (NON-FIXED SYSTEM) Condition of emergency shower & eye washCondition of Sea Water Hose Real (WHR)Condition of Dry Power Hose Reel (DHR) FIRE FIGHTING (FIXED SYSTEM) REM Servicing FM200 suspression system FM200 Fire Suppression System with its control panel (old cylinder)Installation of new FM200 cylinder Inergen Preparation cylinder valve for pressure leak testValve had leak at lower pressureCylinders ready for installationValve test bench CO2 Weighing empty cylinder after removalPreparation for hydrotest on test benchCo2 cylinder after installation Our Projects GEARBOX OVERHAUL GENERATOR OVERHAUL TURBINE MAJOR OVERHAUL COMBUSTION INSPECTION FIRE FIGHTING (NON-FIXED SYSTEM) FIRE FIGHTHING (FIXED SYSTEM) OTHERS